Oak Ridge Property Owner Association
Architectural Construction Form

Please see Deed Restrictions and Interpretations at OakRidgePOA.org for additional information.

Date: ___________________   Project Address: ____________________________________

Project Description: ___________________________________________________________

Owner(s): _______________________________________  Phone: ____________________

Contractor (if applicable): ___________________________________ Phone: _____________

Site Inspected by: ____________________________________________________________
	(for committee use)

Restrictions (complete restrictions may be found on the Oak Ridge POA website (www.oakridgepoa.org/):
1.	Single family residence: minimum 900 square feet with 20% minimum 
        masonry exterior.
        
2. 	Minimum set back requirements for improvements or construction: 20 feet 
        from property line on street side of lot, 10 feet from the 825' mean contour 
        line on lake front lots, 10 feet from back property line on off water lots, and 
        5 feet from the property side property line.  On corner lots, 10 feet from 
        property line on side street of lot.
        
3.	No animals or birds allowed except household pets.

4.	Any business or commercial use must be approved by Oak Ridge POA Board.

5.	No building or structure shall be occupied or used until the exterior is completely finished.

6.	Septic system plan approval in writing from Lower Colorado River Authority (LCRA) prior to approval of permit.

7.	Construction of any building or structure prior to POA approval is prohibited.

8.	No structure of any kind intended for permanent placement for habitation, including but not limited to
        mobile homes, modular homes, and trailer homes shall be moved onto any lot of this subdivision.
        
9.	Any additional structures on the property should match the color scheme of the residential structure.

       Checked Items to be included in the submission (to be determined by two members of the Architectural Committee):
       
____   For new construction:  survey showing property lines with dimension and bearing call outs, setbacks and
       easements, topographical information showing 825' and 828' contours (if applicable), and any existing construction
       on the property, if applicable.       
____   Plot plan, proposed improvements related and dimensioned to property lines, and/or existing construction on site.
____   Plan view with dimensions.
____   LCRA approval drawing and documentation.
____   911 address
____   If a prefab structure is proposed, manufacturer's drawings with dimensions, materials would suffice.

Applicable fees (to be determined by Architectural Committee):
Most of the fees are credited to the Road Repair Fund due to the impact heavy 
construction equipment, cement trucks, building materials trucks,  dirt/dump 
trucks,  contractors/laborers, etc. have on the infrastructure of Oak Ridge.

o	The fee charged to review the plans of a new home is $1000

o	The fee charged for a major renovation, including but not limited to 
        additions and pools, defined as a project requiring the use of heavy 
        construction equipment is $750.  An addition of greater than 900 square feet 
        will be considered the same as new construction and the fee will be $1000.
         
o	The fee for a seawall or boat slip/house is $50.

o	The fee for garages, carports, workshops, paved driveways, greenhouses, etc is $50.
  
o	The fee for fences is $25.  No permit is required for the replacement of 
        roofing materials as it is considered part of maintenance common to all 
        properties.
        
o	Fees are not limited to only the projects listed above but encompass any 
        changes to the property within the neighborhood.  Fees will be determined by a 
        majority of the Architectural Committee and with approval of the Oak Ridge POA 
        Board.
        
o	Should blasting be required at any time during the project, a copy of 
        the Contractor's bond should be submitted to the Committee.  Notice should be 
        given to adjacent property owners, and those directly across streets/coves, of 
        planned blasting, and timing of said blasting.

	A check made payable to "Oak Ridge Estates POA" in the appropriate 
	amount should accompany the application; permit will not be issued until 
	fee is paid.  The Architectural Committee will determine the appropriate 
	fee.

If approval is granted for construction of any structure over a property 
easement, I understand that I may be required to clear the easement of such 
construction should it be required by utility entities.  I understand that any 
damage made to utilities within said easements during construction will be my 
responsibility to repair.  Survey lines used in approvals by the Architectural 
Committee are the owner's responsibility to verify; any encroachment on adjacent 
property will be up to me to correct.  I understand that the project is not to 
be started until written notice is provided by the POA Board President.

_____________________________________		________________________
Property Owner							Date



For committee use only:


Project: ___________________________________________________________________


Architectural Committee Approval:

________________________________________	

________________________________________

________________________________________	

________________________________________


Three signatures required on major projects, two on others


Submitted to POA President on (date) _______________________

President: _____________________________________________

Attached is the Architectural Construction Form recommended for approval by the 

Architectural Committee for (name) _________________________________________________ 

at  (address) ___________________________________________________________________.  

Also attached is the required check in the amount of ____________________.


__________________________________________
Chairman, Architectural Committee


__________________________________________
Oak Ridge POA President







Please return to the Architectural Committee.